Construction cost estimating services, quantity takeoffs, and cost analysis to support accurate budgeting, competitive bidding, and confident project decisions, delivered nationwide by The ACE Services.

Project scope, timeline, and location are discussed upfront to define the full estimating deliverable.
Drawings and specifications are analyzed; if your blueprints aren't finalized yet, this step flags what's missing.
Materials and labor are measured and priced against current local rates using digital takeoff software.
A clear, itemized estimate is delivered along with any cost-saving recommendations as an editable Excel spreadsheet and PDF report.
Construction estimation is the process of forecasting the total cost of a construction project, materials, labor, equipment, subcontractors, overhead, and contingencies, before a single shovel goes in the ground. It's the financial groundwork every later decision gets built on, from securing financing to submitting a competitive bid.
A construction estimate actually includes materials (every item the project requires, quantified directly from the drawings), labor (the hours and trades needed to install those materials, priced at current wage rates), equipment (machinery, tools, and temporary facilities required to execute the work), subcontractor pricing (costs for specialty trades not self-performed), overhead and profit (the business costs and margin built into a competitive bid), and contingency (an allowance for the unknowns every project encounters).
Poor estimates cause problems that compound: budget overruns, cash flow strain mid-project, disputes with contractors over what was actually included, and financing that falls short of what construction actually costs. Accurate estimation, by contrast, supports realistic budgeting, stronger and more competitive bids, better cash flow planning, and fewer disputes once construction is underway.
Preliminary (Budgetary) Estimate: A rough, early-stage number used to test feasibility before design is finalized — useful for initial financing conversations, but not accurate enough to bid or build from.
Detailed (Bid) Estimate: An itemized, quantity-takeoff-based estimate accurate enough to submit in a competitive bid, typically developed to AACE Class 3 standards. This is the type of estimate our Construction Cost Estimating service delivers.
Change Order Estimate: Prices the cost impact of a scope or design change made after construction has already started, so both sides agree on the number before work proceeds.
Accurate, itemized construction cost estimates mean you can bid with confidence, knowing your margins are protected from day one.
Free up your internal team to focus on project execution while our estimators handle the time-consuming quantity surveying and takeoff work.
We adjust labor and material rates based on your specific geographic location, ensuring every estimate reflects real regional construction costs.
A preliminary estimate is a rough, early-stage number used to test feasibility, while a detailed estimate is an itemized, quantity-takeoff-based number accurate enough to submit in a competitive bid.
Accuracy depends on the estimate type: a preliminary estimate might carry a wide range, while a detailed, AACE Class 3 bid-ready estimate is developed to a much tighter accuracy range appropriate for competitive bidding.
Estimates are typically prepared by a professional construction estimator or quantity surveyor, either on staff or outsourced to a dedicated estimating service, using digital takeoff software and current regional cost data.
Submit your blueprints and receive a precision construction cost estimate within 24-48 hours. Expedited turnaround is available.